Pharmaceutical2024A top-10 Bangladeshi pharmaceutical manufacturerMHRA inspection cleared the vision-system observation; footage retrieval that took days now takes minutes.
A Smart Group Company
Twelve documented engagements — the challenge we were handed, what we delivered and the outcome on the ground. Filter by segment or solution; every government project is tagged.
Client identities are anonymized where confidentiality or tender terms require. Scope, value ranges and outcomes are stated as delivered.
Segment
2case studies match
Pharmaceutical2024A top-10 Bangladeshi pharmaceutical manufacturerMHRA inspection cleared the vision-system observation; footage retrieval that took days now takes minutes.
Pharmaceutical2022An API manufacturer exporting to 40 countriesZero instrument downtime during swap-over; the audit observation closed at the next inspection.
Each register entry is written to one template — the same fields your procurement team and your auditors will ask for, nothing filled with adjectives.
Sector, client type and scope of the engagement — anonymized where tender terms or confidentiality require, as with government directorates and regulated pharma plants.
The problem as the client stated it: what was not working, which capability was missing, and what the regulator or group policy demanded.
What DEL designed, supplied and implemented — the products and brands, the architecture approach, the delivery timeline and the support model behind it.
Measured results rather than claims, plus the project value range and year — so every headline number can be checked against the delivery it came from.
One headline number per project, straight from the register — filter above to trace any result back to its case, scope and value range.
Government engagements carry PPR-compliant delivery records and certificate references — see the government section for e-GP status, tender capabilities and downloadable vendor documents.
File movement between districts is now same-day digital; the project closed on schedule with no cost escalation.
Zero service reboots through the 2024 load-shedding season; uptime audited at 99.98%.
2 public-sector engagements shown
Filter the register by segment and solution, or talk to us about the next engagement.