The challenge
Core banking depended on a single data centre; Bangladesh Bank circular required a tested DR site with defined RTO.
What DEL delivered
Dell PowerEdge compute, APC row-cooled racks and structured cabling for a 40-rack DR facility, with replication links to the primary site.
Outcome
DR drills now complete within the mandated 2-hour recovery objective; the site passed Bangladesh Bank inspection first time.